THE FOUR DISCIPLINES
Pick the constraint. We bring the tool.
IMP-01Value stream mappingThe whole flow drawn end to end — material, information, waiting. The map shows where the time and margin actually go.IMP-02Lean tools5S, standard work, visual management, quick changeover — the practical kit, embedded with your crew, not lectured at them.IMP-03Waste reductionThe eight wastes hunted systematically — overproduction to defects — with savings tracked in dollars, not percentages.IMP-04Line balancingTakt time, work elements and station loads rebalanced so the line runs to demand — without adding a single head.
REPRESENTATIVE RESULTS
What moved on recent engagements.
RES-01
+31% line output — packhouse, Hawke’s Bay
Line rebalanced to takt with standard work at each station; overtime eliminated in the same quarter. Six-week engagement.
RES-02
−42% changeover time — plastics, Auckland
SMED applied to the bottleneck press; internal work moved external, changeover halved, batch sizes finally dropped.
RES-03
−18% freight cost — 3PL, Christchurch
Value stream map exposed double-handling between two depots; one routing change, measured for a full quarter before claiming it.
Q&A — IMPROVEMENT
NEXT STEP
Name the constraint. We’ll scope the fix.
A thirty-minute call, the constraint quantified, and a fixed-price improvement engagement in writing.
Book a consultation0800 KAIZEN (524 936) · hello@kaizenconsulting.co.nz
